NEW PRODUCT RANGE – Dry Coolers

CAMpreq has decided to start our new product range DRY COOLERS and are happy to introduce our new partner Stefani Spa from Vicenza in Italy. Through the years we have sold a number of dry coolers from different manufacturers depending on the application requirements. After some time’s search internationally and after careful supplier evaluation, including a factory visit and inspection in December 2019, we have now come to an agreement with Stefani Spa. With close to 50 year’s experience and deliveries to more than 50 countries Stefani is a strong and reliable player in the market. Their focus areas are “Performance” and ”

Cooling Tower Replacement Marieberg

During autumn 2019 CAMpreq,in cooperation with Radiator, replaced two cooling towers which had lived their life time. The plant is owned and operated by E.on in Örebro (central Sweden), where the cooling towers cool three cooling machines that provide district cooling to the nearby industrial area and shopping centre Marieberg. The two new cooling towers of model MITA PME 7204, each with 3,4 MW cooling capacity at design point at a cooling water flow of 415 m3/h and has two motor/fan groups (cells) per unit. Both units are specially adapted to existing site conditions for example with the positions of service hatches

Filter Replacement at Power Plant

After 34 years of operation, we last spring changed a debris filter unit model Taprogge PR-BW 400 to a newer unit with improved design of model Taprogge PR-BW 800. The filter is installerad in a power plant on the Swedish east coast and has been in operation since may. Taprogge’s model name PR-BW is short for Pressure Relief Back Wash, where a rotating arm attached to an outlet in the centre covers the filter surface. The outlet which is connected down stream of the heat exchanger to be protected, thus creates a pressure drop which automatically sucks off the filter surface

Four cooling towers in operation at Fors Mill

Stora Enso in Fors have now completed the test run period of four large PME 7204 Super Silent evaporative cooling towers at their waste water treatment plant. And so far, the equipment has done their job well according to Stora Ensos Project Manager. The installation and start up was performed earlier this spring although some of the work surrounding the units needed further completion. Now the fixed protective railings have been put in place as well as the special fire protection walls. The project is a typical example where we have acted as technical advisors with site specific customization for best solution.

MITA Days – Sales Conference

On 23-25 September MITA Cooling Technologies held their “MITA Days” sales conference with their European sales representatives in Siziano just south of Milano. Participants from 10 countries gathered at MITA’s headquarters to get to know each other, hear about the latest news and together perform some joint excersizes to identify areas of joint improvements for the future. Among other things, we can present the new product PME Silent Plus. The PME-model is the type most popular and commonly used amongst MITA’s product range in Sweden with its very simple design, set-up and with minimal requirement for maintenance. In the new PME-version Silent Plus,

New Plate Heat Exchanger!

We are pleased to announce SPX APV’s launch of the MIRA ENERGY SAVER ELITE. The latest design from SPX FLOW is suitable for hot/chilled water, central heating/cooling, water/water, and water/oil applications. The MIRA Energy Saver Elite delivers the most efficient thermal performance by having the optimal plate design, reduced footprint and minimal components for ease-of-service. Two gasket options, NBR (FDA) and EPDM exclusively use the DOUBLECLIP gasket-affixing system, enabling gasket stability and quick tool-free changeout. The MIRA plates feature a graduated chocolate box design for better thermal performance and a corrugated pattern to promote turbulence and minimize fouling. With appropriate selections, one can

Large silencer delivered

In May we supplied a two stage steam blow off silencer of ”splitter type” with special transport from factory in Germany to the end customer, a paper mill on the Swedish northwestern coast. The unit weighs in at 5 tons with measuring an impressive 4 m length and 2,7 m diameter. The silencer decreases the soundlevel of overheated high pressure 64 bar steam from 170 dBA Lb at the relief valve down to 90 dBA at 20 degree’s angle 10 m out from the silencer outlet. Huge thanks to our nice and reliable logistics partners Silent Transport in Varberg, Sweden who in

Mutiple tube cleaning systems retrofit

A project that started as a college student’s study later resulted in the supply of four complete Taprogge Tube Cleaning systems for a power station in Stockholm. The systems are retrofitted on a district cooling plant which has been in operation for a long time, which caused a high deamnd on adapting to the present site conditions and space available. The plants which is used for district heating during winter time and as district cooling system during the summer months, has been struggling a long time with fouling inside the tubes of their tube heat exchangers and condenser units (1+1 per

Tube heat exchanger Argon cooling

During the spring we have delivered a tube heat exchanger for gas cooling to an industrial client in the city of Luleå. It has now been installed and pressure tested and will be taken into operation shortly. The media on the tube side is Argon and 40% glycol/water mix on the shell side. The heat exchanger is in 1 pass configuration with a cooling effect of 45 kW. The unit is 2,4 meter long and 0,3 m in diameter with a heat transfer area of 25 m². With its titanium stabalized stainless steel material it ways in at 490 kg. If you